| Sign In | Join Free | My futurenowinc.com |
|
Brand Name : Huaview
Model Number : DIe casting mold base
Certification : ISO9001
Place of Origin : Dongguan China
MOQ : 1 set
Price : offer price base on the drawing
Payment Terms : T/T
Supply Ability : 40 sets per month
Delivery Time : 7-20 working days
Packaging Details : wooden case packing
Application : Injection Die casting Molding
Cavity : 1 or multi, family mold
Certificate : ISO9001
Features : Precision
Inspection : 100% Inspection
Lead Time : 7-15 Days
Material : P20
Package : Wooden Case
Processing : CNC, Grinding, Drilling
Product Name : P20 Mold Base
Size : Standard or customize
Surface Roughness : Ra0.4
Tolerance : ±0.01mm
| Mold Base Type | Injection mold/ Die casting mold, compress mold | Additional machining | Drill Water line, rough machining |
| Material | P20,S50C,NAK80,S136……… | Outside of mold base | Grinding |
| Life shots | 1,000,000 shots | Accessory Part | DME,HASCO,LKM standard |
| File format | X-T, STP, IGS, Solidwork | Customer customization | available |
| Unit of Dimension | MM, or INCH | Crane Thread | Metric, or English |
| Hot runner need | Yes | Packing | Vacuumize & wooden case packing |

Work shop:

Inspections

Valve add service.
Questionary
Please send me the drawing and require, and then we make offer the most competitive price, and deliver the moldbase after finished.
To ensure quality, both the A side plate and B side plate are machined using the same machine. This ensures that the guide pins and bushes are in the same position, maintaining consistency. Additionally, we conduct a thorough inspection of the moldbase before shipment. If any dimensions are found to be rejected, we will rework a new plate to meet the required specifications.
We accept CAD file formats such as X-T and STP. These formats are suitable for our design and manufacturing processes.
We can handle the shipment by our company, we can deal with EXW, FOB, CIF and DAP term.
For the size below 500mm, the lead time is 5-10days, for the size from 600-1200mm the lead time will be 10-15 days, for the size over 1500mm, the lead time will be about 15-20days.
But we can put you work in top priority if you order are very urgent. Lead time can be adjustable.
|
|
Rubber Compress Precision Mold Base P20 Steel Material With CNC Machining Images |