| Sign In | Join Free | My futurenowinc.com |
|
Brand Name : Huaview
Model Number : DIe casting mold base
Certification : ISO9001
Place of Origin : Dongguan China
MOQ : 1 set
Price : offer price base on the drawing
Payment Terms : T/T
Supply Ability : 40 sets per month
Delivery Time : 7-20 working days
Packaging Details : wooden case packing
Application : Injection Die casting Molding
Cavity : 1 or multi, family mold
Certificate : ISO9001
Features : Precision
Inspection : 100% Inspection
Lead Time : 7-15 Days
Material : P20
Package : Wooden Case
Processing : CNC, Grinding, Drilling
Product Name : P20 Mold Base
Size : Standard or customize
Surface Roughness : Ra0.4
Tolerance : ±0.01mm
Mold Base P20 - CNC Machining with Fast Turnaround Time
Our P20 Mold Base is made from high-quality P20 steel with CNC machining process. It is suitable for a wide range of applications such as injection molds, stamping tools, and die casting molds. Our P20 Mold Base has an excellent corrosion resistance and wear resistance. It also has good thermal conductivity and mechanical strength.
We have a wide range of sizes available for our P20 Mold Base, both standard and customize sizes. The production time usually takes about 10-20 days, which is much faster than traditional production methods.
Our P20 Mold Base is made with grinding and drilling process to ensure precision and accuracy. It is highly durable and has an excellent finish. With its superior quality, our P20 Mold Base is ideal for a wide range of industries.
Specification
| item | |
| Place of Origin | China |
| Guangdong | |
| Shaping Mode | Plastic Injection Mould |
| Product Material | Steel |
| Product | Mould component |
| Keyword | Mould Base |
| Mould life | More than 500,000 shots |
| Mold material | S50C/P20/718/738/NAK80/S136/2738/2316... |
| Mould base size | Standard mould base/Customized mould base |
| Runner | Hot runner/Cold runner |
| Surface treatment | grinding |
Applications:
We supply mold base to the mold maker worldwide, and service follow industry.



Valve add service.
Questionary
Please send me the drawing and require, and then we make offer the most competitive price, and deliver the moldbase after finished.
A side plate and B side plate are machine by same machine, the can maintain the guide pin and bush are in same position, We do fully inspection before shipment, we can rework a new plate if dimension is reject.
X-T, STP, format is fine for us.
We can handle the shipment by our company, we can deal with EXW, FOB, CIF and DAP term.
For the size below 500mm, the lead time is 5-10days, for the size from 600-1200mm the lead time will be 10-15 days, for the size over 1500mm, the lead time will be about 15-20days.
But we can put you work in top priority if you order are very urgent. Lead time can be adjustable.
|
|
Hot Forging Injection Mold Base , CNC Machining Die Casting Mold Images |